New and Recent Projects

 

 

 

Candlewood ShoresCandlewood Lake Milfoil

Federal and State authorities are aggressively monitoring the health of the lakes in the US and more specifically CT. Candlewood Lake is the largest lake in the state. The lake is under increasing environmental stress and under the watchful eye of the Candlewood Lake Authority. The WPCA is participating in studies to determine if removing septic flows into the lake will improve the quality of this important recreational and economic resource. [More ...]

Picture at right showing milfoil in Candlewood Lake.

 

Rollingwood Condominiums

The condo owners have their own dedicated collection system and pump station with an emergency generator to pump sanitary sewer wastewater up to Federal Road. The condo association representatives have requested a feasibility study to connect by gravity to the Brookfield sewer system, avoiding the maintenance costs of maintaining the pump system. There are two new possibilities: Connecting into the new Sandy Lane system or the new Del Mar Drive system. The Sandy Lane/Old Gray's Bridge Road route is the lowest cost option that will work by gravity. The original study is completed which involves routing through Sandy Lane properties. Approvals are needed by both Condo associations in 2016. 

Old New Milford Road Project and Del Mar Drive Extension

A project was approved and funded to construct sewers to service properties in the area of the island between Old New Milford Road and Federal Road. Some properties can now expand or build in this industrial zone. It was not previously possible because conforming septic systems cannot be built. Also, the area is not septic-friendly. Some properties have failed systems that cannot be repaired. Subsequently they could not be sold for further development.  

This project was the subject of a News-Times article. In the article where water is mentioned, the meaning is sewer water.   

Sandy Lane

This project was proposed, approved, engineered, and subsequently completed to remove pumps and generators at the Sandy Lane condo complex as well as for commercial properties just across from Costco on Federal Road. Construction was completed early Autumn 2011. These properties are now connected to the sewer system by gravity. This opportunity has become available since the Three Condo district was installed.

High Meadow, Ledgewood, Newbury Crossing Condo Area

At the request of the High Meadow Condo Owners Association, and consent from the Board of Selectman and the Planning Commission, the WPCA has embarked on an initiative to study the engineering and costs of sewering the condo complexes bordered by the Rail Road, Route 133 and Silvermine Road, thus including the Newbury Crossing and Ledgewood Condos. The application for Wetlands approval was quite extensive. The project was under construction November 2014 through June 2015. 

Dean Road Area

The office of the Town Sanitarian has made an informal finding that properties on Dean Road and on Pocono Road from Silvermine to Route 25 have had systematic septic failures. Repairs cannot conform to current standards, primarily due to hard soil conditions with poor drainage in the entire area.

The Sanitarian office has successfully petitioned the Board of Selectman to allow the installation of sewers to be investigated. Consequently, the WPCA has begun the task to determine possible routing and costs. Planning Commission approval is also needed before the project can move forward. Given a green light from the Planning Commission, an early step in the process was to have a Public Hearing to review the project with affected property owners. That session was attended by a small number of affected residences. A survey went out to property owners to gauge the desirability of installing sewers in this area. The results were about 1/3 Yes; 1/3 No and 1/3 no response. The matter is referred back to the Town Sanitarian for action. That office must take an affirmative action for the WPCA to act further. 

Final Pump Station Grinder and Generator

When the sewer system was first built, the practice of installing grinders prior to the pumps was not generally used. With about two-thirds of the flow coming from the Southwest area that is not pre-ground, the WPCA installed a grinder at the main pump station at the Kohls parking area. This project was completed late 2012. It is a significant improvement to the sewer infrastructure in Brookfield.  [More ...]

A new generator now sized to handle the entire station needs was installed in 2015 fueled by natural gas. The cost for both initiatives was $400,000 and funded by contribution to capital from user fees.